建筑工程施工进度计划编制中的关键节点控制研究

Research on key node control in the preparation of construction schedules for building projects

ES评分 0

DOI 10.12208/j.ace.202500015
刊名
Advances in Constructional Engineering
年,卷(期) 2025, 5(1)
作者
作者单位

四川省攀枝花市建筑机械化施工有限公司 四川攀枝花

摘要
建筑工程施工进度计划编制是确保项目按期交付的核心环节,关键节点控制直接影响工期、成本与质量。随着建筑规模扩大与技术复杂度提升,动态化与精细化管控成为管理重点。研究通过分析关键节点的定义、影响因素及控制策略,提出结合信息技术与风险管理的综合方法,为提升施工效率与资源利用率提供理论支持。
Abstract
The preparation of construction schedules is crucial to ensuring on-time delivery of projects, with key node control directly affecting duration, cost, and quality. As construction scales enlarge and technological complexity increases, dynamic and detailed management becomes a focus. This study analyzes the definition, influencing factors, and control strategies of key nodes, proposing an integrated approach that combines information technology with risk management, providing theoretical support for enhancing construction efficiency and resource utilization.
关键词
建筑工程;施工进度;关键节点;控制策略;BIM技术
KeyWord
Building engineering; Construction schedule; Key nodes; Control strategies; BIM technology
基金项目
页码 68-71
  • 参考文献
  • 相关文献
  • 引用本文

王体. 建筑工程施工进度计划编制中的关键节点控制研究 [J]. 建筑工程进展. 2025; 5; (1). 68 - 71.

  • 文献评论

相关学者

相关机构