| Abstract |
The buried depth of fault-controlled reservoir of No.2 Block in Shunbei oil-gas field is more than 8,200 ̄9,300 m, with complex lithology, many fracture zones and fractures, gas-oil ratio up to 3,000 ̄24,000, and temperature exceeding 165 ̄210 ℃. There are many problems such as collapse, lost circulation, gas invasion and long drilling period during the drilling. Therefore, by applying the well-seismic combination technique, the required sealing points were selected and the three-pressure values were corrected, and the two four-stage well structures were optimized. Based on the principle of tight fracture plugging, two drilling fluid formulations of anti-leakage and plugging while drilling were selected, and the pressure bearing capacity of Permian and Silurian fractured formations was increased by more than 0.08 g/cm3. The pre-bending bottom hole assembly is selected to replace the vertical drilling system so as to realize the deviation control and fast drilling. Four-stage borehole profile is designed to realize deviation in low-temperature well section and deviation stabilization in high-temperature well section, so as to meet ultra-high temperature directional drilling. The differential pressure control process is optimized to reduce gas intrusion and lost circulation so as to realize long distance oblique penetrating of the main or secondary fault zone. The above well structure design and supporting technology were applied to 12 wells, shortting the average period by 119.2 days, setting the deepest record of 9,300 m for onshore directional drilling in Asia, and providing technical support for the efficient development of fault-controlled reservoir of No.2 Block in Shunbei oil-gas field.
|