盐岩地层水泥环缺失对套管完整性的影响机理
Mechanism of cement sheath loss on casing integrity in salt rock formations
ES评分 0
| DOI |
10.6056/dkyqt202605019 |
| 刊名 |
Fault-Block Oil & Gas Field
|
| 年,卷(期) |
2026, 33(5) |
| 作者 |
|
| 作者单位 |
1.中国石油大学(华东)石油工程学院,山东 青岛 266000;2.中国石油天然气股份有限公司浙江油田分公司,浙江 杭州 310000
|
| 摘要 |
为揭示盐岩地层中水泥环缺失对套管完整性的影响机理,基于伊拉克米桑油田Lower Fars层盐岩岩心蠕变实验,建立修正Burgers黏弹性本构模型,并在ABAQUS平台构建“套管 ̄水泥环 ̄地层”耦合模型,系统分析水泥环不同缺失角度下盐岩蠕变填充与套管应力演化规律。研究结果表明:水泥环缺失角度对套管有效应力与变形模式影响显著,随着水泥环缺失角度由15°增至90°,套管最大有效应力逐渐升高,并在90°~120°达到峰值;当水泥环缺失角度超过120°后,盐岩蠕变填充效应增强,水泥环缺口处区域对应的套管有效应力峰值下降;有效应力峰值出现时间随水泥环缺失角度增大呈非线性变化,水泥环小角度缺失时约在固井结束后7 d内趋稳,而水泥环大角度缺失时需数十天方达平衡。本次研究揭示了“水泥环缺失—地应力释放—应力集中—盐岩蠕变—应力再平衡”的耦合链条,为盐岩区套管钢级优化、固井质量控制及补救时机判定提供了理论依据。
|
| Abstract |
To reveal the influence mechanism of cement sheath loss on casing integrity in salt rock formations, a modified Burgers viscoelastic constitutive model is established based on creep experiments of salt rock cores from the Lower Fars Formation in the Missan Oilfield, Iraq. A coupled "casing-cement sheath-formation" model is built on the ABAQUS platform to systematically analyze the laws of salt rock creep filling and casing stress evolution under different loss angles. The research results show that the cement sheath loss angle exerts a significant influence on the effective stress and deformation mode. With the cement sheath loss angle increasing from 15° to 90°, the maximum effective stress of the casing rises gradually and reaches a peak within the range of 90° to 120°. When the cement sheath loss angle exceeds 120°, the creep filling effect of salt rock is enhanced, and the peak effective stress of the casing corresponding to the cement sheath gap decreases. The occurrence time of peak effective stress varies nonlinearly with the loss angle. The stress stabilizes within about 7 days post cementing for small missing angles, while equilibrium takes dozens of days for large ones. This study reveals the coupling chain of "cement sheath loss-in-situ stress release-stress concentration-salt rock creep-stress re-equilibration", providing a theoretical basis for casing steel grade optimization, cementing quality control and remediation timing determination in salt rock formations.
|
| 关键词 |
盐岩;蠕变;UMAT子程序开发;套管完整性
|
| KeyWord |
salt rock; creep; UMAT subroutine development; casing integrity
|
| 基金项目 |
|
| 页码 |
855-863 |
张喆; 闫传梁; 韩忠英; 程远方; 薛明宇.
盐岩地层水泥环缺失对套管完整性的影响机理 [J].
断块油气田.
2026; 33; (5).
855 - 863.