| Abstract |
A high-dip oil reservoir in Xinjiang suffers from low oil recovery and untapped remaining reserves due to poor reservoir physical properties, large structural amplitude and limited waterflooding efficiency, urging the exploration of high-efficiency enhanced oil recovery technologies. Taking a typical dipping reservoir in this block as the research object, this paper systematically carried out the feasibility study and the optimal design of injection-production scheme of CO2 flooding in combination with reservoir geological characteristics and fluid properties. Firstly, laboratory gravity-stabilized flooding experiments were conducted to determine the optimal operation conditions: the "high injection and low production" gas injection mode, formation dip angle of 15 ̄30°, and injection rate below 0.6 mL/min. Furthermore, a fine numerical simulation with 26×104 grids was established based on the seven-component Peng-Robinson equation of state, from which the vertical injection and vertical production well pattern with 2 injectors and 5 producers was optimized. A combined development scheme was also determined, including CO2 conversion at a recovery degree of 3.5%, gas injection volume of 0.10 PV and single-well liquid production rate of 10 m3/d. Meanwhile, a multi-level risk response plan was formulated in consideration of well-controlled pressure limits and dynamic gas channeling risk control. Field trials show that within 12 months, the cumulative gas injection reached 6 516 t, the cumulative incremental oil production was 3 127 t, and the stage oil-gas replacement ratio stood at 0.48 t/t, achieving a profit of 1.125 million yuan, which effectively verified the effectiveness and economic benefits of the proposed scheme. Compared with the traditional development method, the optimized CO2 flooding technology increased the oil recovery factor by 10.97 percentage points, showing a good prospect for popularization and application. The CO2 gravity flooding technical system formed in this study covers the entire process of experimental evaluation, numerical simulation, engineering optimization, risk management and control as well as field verification, providing a replicable and scalable technical approach for the efficient development and carbon sequestration of high-dip and low-permeability reservoirs, and has important guiding significance for the development of similar reservoirs.
|