基于BIM技术的水利水电工程进度管理优化方案

Optimization scheme of progress management for water conservancy and hydropower projects based on BIM technology

ES评分 0

DOI 10.12208/j.jer.20250178
刊名
Journal of Engineering Research
年,卷(期) 2025, 4(4)
作者
作者单位

常德市鼎城区应急管理局 湖南常德

摘要
伴随水利水电工程规模持续扩张,传统进度管理模式弊端日益凸显。信息传递滞后、资源调配失衡等问题频发,严重制约工程建设效率与效益。BIM 技术凭借强大的信息集成与可视化能力,为工程进度管理革新带来机遇。本文系统剖析水利水电工程进度管理现状,深入挖掘现存问题,构建基于 BIM 技术的优化方案,并详细阐述其应用优势,旨在推动工程进度管理向精准化、智能化迈进,为行业高质量发展提供理论与实践参考。
Abstract
As the scale of water conservancy and hydropower projects continues to expand, the drawbacks of traditional progress management models have become increasingly evident. Issues such as delayed information transmission and imbalanced resource allocation frequently arise, severely constraining construction efficiency and benefits. BIM technology, with its powerful capabilities in information integration and visualization, presents opportunities for innovation in project progress management. This paper systematically analyzes the current status of progress management in water conservancy and hydropower projects, delves into existing problems, and constructs an optimized solution based on BIM technology. It also elaborates on the application advantages, aiming to advance project progress management towards precision and intelligence, providing theoretical and practical references for high-quality industry development.
关键词
BIM技术;水利水电工程;进度管理;优化方案;协同平台
KeyWord
BIM technology; Water conservancy and hydropower engineering; Progress management; Optimization scheme; Collaborative platform
基金项目
页码 102-104
  • 参考文献
  • 相关文献
  • 引用本文

丁桥浩. 基于BIM技术的水利水电工程进度管理优化方案 [J]. 工程学研究. 2025; 4; (4). 102 - 104.

  • 文献评论

相关学者

相关机构