房建工程项目施工进度与成本协同控制策略

Strategies for synergistic control of construction progress and cost in housing construction projects

ES评分 0

DOI 10.12208/j.ace.2025000143
刊名
Advances in Constructional Engineering
年,卷(期) 2025, 5(4)
作者
作者单位

江西万全建设工程有限公司 江西上饶

摘要
房建工程项目施工进度与成本相互影响、相互制约,实现两者协同控制是提升项目经济效益与竞争力的关键。当前房建工程在进度与成本控制上存在计划欠科学、方法落后、缺乏协调等问题。围绕确立协同控制目标,从计划管理、资源配置、动态监控、技术创新等方面制定策略,并构建组织、制度、技术保障体系。旨在为房建工程提供有效协同控制路径,推动行业管理模式优化升级,适应市场竞争与行业高质量发展需求。
Abstract
The construction progress and cost of housing construction projects are interrelated and mutually restrictive. Achieving synergistic control between these two aspects is crucial for enhancing the economic benefits and competitiveness of the project. Currently, there are issues with the scientific planning, outdated methods, and lack of coordination in the control of construction progress and cost in housing construction projects. To establish synergistic control objectives, strategies are formulated from aspects such as planning management, resource allocation, dynamic monitoring, and technological innovation, and an organizational, institutional, and technical support system is established. The aim is to provide effective synergistic control pathways for housing construction projects, promote the optimization and upgrading of industry management models, and meet the demands of market competition and high-quality industry development.
关键词
房建工程;施工进度;成本控制;协同管理;控制策略
KeyWord
Housing construction projects; Construction progress; Cost control; Synergistic management; Control strategies