| Abstract |
The hardware design, programming design ideas and methods of traditional Metro bas (environmental control and equipment monitoring) can not meet the design requirements of GWQS-ISCS (green, intelligent, quality and safe ISCS) of Beijing Metro New Metro Project [1]. Bas integrated design includes: cabinet design, integrated circuit design, PLC programming integrated design, software and hardware integration test. BAS system integrated product design has a series of impacts on subsequent product delivery, installation and commissioning, operation and maintenance. In order to improve the GWQS design efficiency and quality of BAS system of Beijing line 17 [1]. This paper presents a method of BAS hardware integration standardization, which is designed from different dimensions, such as hardware design standard, integrated circuit standardization, drawing generation automation, and program output automation. This method optimizes the design process and method, can improve the efficiency of each link, shorten the construction period, realize the transformation of drawing generation automation and product integration automation, and can also meet the high-quality and safety standards to ensure the safety of public transportation .
|