优化绿色通道护理对AIS患者DNT时间的影响

The impact of optimizing green channel nursing on DNT time in AIS patients

ES评分 0

DOI 10.12208/j.jacn.20240160
刊名
Journal of Advances in Clinical Nursing
年,卷(期) 2024, 3(4)
作者
作者单位

琼中县黎族苗族自治县人民医院 海南 ;

摘要
分析优化绿色通道护理对急性缺血性脑卒中(AIS)患者急救至静脉溶栓治疗时间(DNT)的影响。方法 将我院急诊科于2023.01月-2023.12月收治的96例AIS患者作为研究对象,通过随机数字表法分为对照组及观察组,每组各48例。对照组采用常规急诊护理,观察组采用优化绿色通道护理,对比两组护理效果。结果 观察组在采用优化绿色通道护理后,其急救时间指标、救治有效率、溶栓后功能评分均优于对照组,组间差异显著(P<0.05)。结论 优化绿色通道护理可有效缩短AIS患者DNT,提高其救治有效率,并改善其预后。
Abstract
Objective To analyze the impact of optimizing green channel nursing on the time from emergency treatment to intravenous thrombolysis (DNT) in patients with acute ischemic stroke (AIS). Methods A total of 96 AIS patients admitted to the emergency department of our hospital from January, 2019 to December, 2019 were selected as the study objects and divided into control group and observation group by random number table method, with 48 cases in each group. The control group received routine emergency nursing, the observation group received optimized green channel nursing, and the nursing effect of the two groups was compared. Results After adopting optimized green channel nursing, the observation group showed better first aid time indicators, treatment effectiveness, and post thrombolysis function scores than the control group, with significant differences between groups (P<0.05). Conclusion Optimizing green channel nursing can effectively shorten the DNT of AIS patients, improve their treatment efficiency, and improve their prognosis.
关键词
优化绿色通道护理;急性缺血性脑卒中;静脉溶栓
KeyWord
Optimizing green channel care; Acute ischemic stroke; Intravenous thrombolysis
基金项目
页码 116-118
  • 参考文献
  • 相关文献
  • 引用本文

莫小婷*. 优化绿色通道护理对AIS患者DNT时间的影响 [J]. 临床护理进展. 2024; 3; (4). 116 - 118.

  • 文献评论

相关学者

相关机构